Line Division:

Suncor Energy 2009 tower

Overhead Distribution

  • 1PH & 3PH Transformer Pole & Platform Mounted Banks
  • Installation & Maintenance of Gang Operated Load Break Switches
  • Insulator Changes
  • Line Construction & Maintenance
  • Live Line Construction, Maintenance & Tension Stringing
  • Pole & Hardware Replacement
  • Pole Framing & Setting
  • Single Phase & Three Phase Line Conversions & Relocations
  • Telecommunication Line Stringing

Transmission Line Construction

  • Change & Inspect Insulators
  • Change Cross Arms &Timbers
  • Framing & Setting Wood Structures &Steel Towers
  • Installation of Pole Mounted Switches
  • Insulator Changes
  • Line Construction & Maintenance
  • Live Line Construction, Maintenance & Tension Stringing
  • Maintenance of Hardware
  • Pole & Hardware Replacement
  • Pole Framing & Setting
  • Reconductor & Tension String Lines

Substations

  • Grounding
  • Breaker Installation
  • Capacitor Station Installations
  • Steel & Wood Structure Installations & Maintenance
  • Switch Station Installations
  • Transformer Installations & Changeouts
  • Turnkey Installations

ecabc      lca